 |
| - ISO 9001
(QSR-085) |
• Division : instrument & control
• Duration : 1999.03.29 ~ 2002.03.28 |
|
| |
 |
| - NPP Q-Class
(N9907-068) |
• Division : Nuclear (J210) Aux/ Local
Control Panel • Duration : 1999.07.22
~ 2002.07.21 |
|
| |
 |
| - KEPIC(EN-0122) |
• Division : Electrical Class-1 of Low
Voltage Switchgear in Nuclear Power
Plant • Busbar of Metal Clad
• Motor Control Center •
Inverter • Static Switch •
Power Distribution Panel • Manufacture
of Control Panel • Duration : 1999.11.16
~ 2002.11.15 |
|
| |
 |
- Hydraulic/
Thermal R-Class
(H0002-218) |
• Division : Hydraulic/Thermal Boiler/
BOP DCS System • Duration :
2000.03.31 ~ 2003.03.30 |
|
| |
 |
- Hydraulic/
Thermal R-Class
(H0012-301) |
• Division : Simulator of Hydraulic
/Thermal Power Plant • Duration
: 2000.10.01 ~ 2003.09.30 |
|
| |
 |
- Hydraulic/
Thermal R-Class
(H0101-309) |
• Division : Hydraulic / Thermal Power
Plant Load Center • Power
Plant Motor Control Center • High
Voltage Metal Clad Switchgear • Duration
: 2001.01.16 ~ 2004.01.15 |
|